Monday, 21 November 2016

regular posts

21/11/16


Today we went to the studio as a class with our I pads to update our blogs and fill in for anything that we may have missing, on them. This had to be done effectively before we could continue with our shooting.
However due to the failing of one camera we are unable to process with the shooting and have to use our ipads to shoot, meaning we would have to download the app that connects the rolling footage to the visual mixer, in order for the multicam production to come together perfectly.
Before we could proceed with our Ipads we had to wait for Danielle to download the app first, and demonstrate how the app would be able to connect with the visual mixer.


No comments:

Post a Comment