01/01/17
We are London run through practise
Today we did a last practise
for our production of we are London
We set up the equipment and the lay out of our production effectively and quickly in order for the run through process to be quicker than we normally do it.
It took us maximum 15 minutes to set up, and ensure everyone knew what their roles were in the process of the production.
Although we didn't have our live performances we still decided to go ahead and do a run through so we could get a hang of how the lay out and time scale of our production will be.
Normally our production would normally run for 20 minutes but due to the absence of some our team members and the live performances, we were unable to proceed for the maximum minutes that we should normally do.
On the other hand, as a group we have improved in the setting up and production of the we are London.
We used the other group from social challenge to act out as our contestants and presenter for our production in the mean time. Running through the script and making sure we cue the lights and sounds at the correct time.
The images below also show how our team split themselves up to make sure, that they did their required roles
No comments:
Post a Comment